The site at 159th and Metcalf, once the site of a proposal by St. Louis-based LuxLiving, now has a new plan by local developer Oddo Development.

At Overland Park’s April 7th Planning Commission meeting, plans will be reviewed for a massive mixed-use development that includes:

  • 873 apartments
  • 62 “brownstone” units
  • 26,000sf of commercial space
  • 1630 parking spaces (719 surface, 641 garage, 146 “tuck under” garage stalls, and 124 private garage stalls in the brownstones)

The buildings will be clad in a mixture of brick, metal, EIFS, stone veneer, and wood and stand a maximum of 5-stories.

The development will replace a Greenfield at the southeast corner of the 159th and Metcalf intersection. Nearby is a Walmart store, the Blue Valley High School, and the under construction “Bluhawk” shopping center at 159th and US-69.

159th and Metcalf is just one of Oddo’s development large Johnson County projects. At 135th and State Line, “East Village” will include a mixture of single-family, twin villas, brownstones, apartments, retail and office space across 116 acres.

Lenexa-based Oddo Development is the developer for the project. Klover Architects is the design architect.

Leave a comment

CONTENT NOTE

Effective January 1st 2026, all project photo updates, sharing of links, and other content will be shared on social media exclusively to X (formerly Twitter). Posts will continue being written on this website but will no longer be shared to Facebook. If the need arises to reactivate the Facebook page, I will alert readers.

Thank you – Chris Stritzel